HOME / METHODOLOGY

FDE —
engineers deployed to where the problem lives

Forward Deployed Engineering was pioneered at Palantir and is now the delivery model shared by the world's leading AI companies. Its core belief is simple: the answers to enterprise AI live in the field, not the conference room.

01WHY FDE

Why traditional models
can't deliver enterprise AI

Traditional consultants understand the business but don't write production code. Product companies have the tech but never enter your workflow. Enterprise AI sits exactly in between: it needs deep business understanding and serious production engineering — both, not either.

FDE solves both with one role: engineers embed in your team, see the problem first-hand, build the system with their own hands, and own the production outcome. Translation loss goes to zero; delivery cycles compress from quarters to weeks.

“Sending our best engineers to where the problem lives is the only guarantee of delivery quality we trust.” — the MatrixLabs founding team
02COMPARISON

Three models, one comparison

Traditional consultingGeneric AI productsMATRIXLABS FDE
Delivery modelDecks and proposalsStandard features, integrate yourselfEmbedded, on-site engineering
First working system3–6 monthsDepends on internal resources14 days (on real data)
Business understandingInterviews and surveysAlmost noneOn-site co-creation, deep in the workflow
Production accountabilityHanded to the clientClient's own responsibilityEnd-to-end, through production launch
Capability retentionA reportVendor lock-inPlatform + enablement; capability stays with you
03DELIVERY

Five phases, measured in weeks

Every phase has explicit deliverables and exit criteria — you always know where the project stands and what comes next.

01WEEK 0 — DIAGNOSE

Diagnose

Define the use case, business value, data feasibility, and success metrics.

  • Deliverable: scenario value map
  • Deliverable: success-metric definition
02WEEK 0–1 — EMBED

Embed

FDEs join the customer team to understand processes, systems, and how work actually happens.

  • Deliverable: on-site process inventory
  • Deliverable: data feasibility assessment
03WEEK 1–3 — BUILD

Build

Select MatrixLabs products and build the business capabilities the use case requires.

  • Deliverable: real-data prototype
  • Deliverable: scenario eval baseline v1
04WEEK 3–6 — SHIP

Ship

Complete evaluation, system integration, safety guardrails, and production deployment.

  • Deliverable: production launch
  • Deliverable: audit & compliance docs
05WEEK 6+ — TRANSFER

Transfer

Transfer code, documentation, evaluation sets, and the operating playbook.

  • Deliverable: scenario expansion blueprint
  • Deliverable: team enablement plan
04THE POD

Anatomy of an FDE pod

Small but complete: one pod carries everything from business understanding to production operations, and owns the outcome directly.

POD / FDE ×2

Forward Deployed Engineers

Embedded at the client site — understanding the business, building the system, owning the result. The pod's core engine.

POD / SA

Solutions Architect

Designs the overall solution and integration path, holding the line on security, compliance and architectural quality.

POD / PE

Platform Engineer

Backs the front line with Matrix OS: connectors, environments and platform capabilities on call.

POD / DL

Delivery Lead

Owns cadence and priorities, manages risk, and makes sure every week ships verifiable progress.

05PRINCIPLES

Six delivery principles

P / 01

Ship in weeks

Demonstrable progress every Friday. No “80% in progress” — only “live” or “not live”.

P / 02

Field first

On site for the critical phases. One field observation beats ten requirement documents.

P / 03

Validate on real data

Prototypes run real data from day one. Success on synthetic data proves nothing.

P / 04

Production is the only bar

A demo isn't delivery. Only systems the business relies on daily count.

P / 05

Transparent and auditable

Progress, eval scores and costs are fully visible to the client; every decision leaves a record.

P / 06

Knowledge transfer built in

Paired with your team from week one. By project end, the capability lives in your organization.

NEXT STEP

Two weeks from now,
see your first prototype